Case Study: Thames Water

Thames Water in London

By integrating DRI™ survey outputs into its asset management framework, Thames Water was able to assess the appropriateness of planned £225M mains renewal investment.

The Hidden Giant: Why Asbestos Cement Pipe Still Matters in 2025

For utilities across the U.S. and Canada, the implications are clear. AC pipe is everywhere—2,000 miles in San Diego, 67 percent of Regina’s system, one-third of networks in many BC communities. With break rates rising and budgets stretched thin, doing nothing is no longer an option.

Case Study: Brabant Water

When Brabant Water needed a reliable way to assess aging asbestos cement mains, they turned to KenWave’s non-invasive DRI™ technology. The result? A successful trial that met every performance benchmark—and set the stage for scalable deployment across their network.

UESI Pipelines 2025 Conference

KenWave Solutions was proud to exhibit at the UESI Pipelines 2025 Conference, held August 9th – 13th, 2025 in Tampa, Florida. Pipelines 2025 brought together pipeline engineers, contractors, manufacturers, researchers, utilities, and more from around the world to share their experiences in meeting the challenges of modern pipeline infrastructure.

AWWA ACE25

AWWA ACE25

Visit KenWave at Booth #1228 during the AWWA ACE25 Conference & Expo and learn how external, non-invasive condition assessments are helping utilities assess aging pipelines with confidence—while keeping service uninterrupted.

2025 AWWA-PNWS

Thank you to everyone who connected with us at the AWWA Pacific Northwest Section Conference in Boise, Idaho, from May 7–9, 2025. We appreciated the opportunity to share how our Dynamic Response Imaging™ (DRI) technology is transforming pipeline condition assessments.